25.08.2026, 14:19
ASTANA. Aug 25 (Interfax-Kazakhstan) - The third single point mooring (SPM) at the Caspian Pipeline Consortium (CPC) has been installed and is expected to begin operating in September, Kazakh Minister of Energy Yerlan Akkenzhenov said.
To read the full news articles, Subscribe.
02:00PM
Kazakhstan loses 3.5 mln tonnes of oil production following attacks on CPC in 2026 - energy ministry